瀏覽 的方式: 作者 國立中興大學應用數學系

跳到: 0-9 A B C D E F G H I J K L M N O P Q R S T U V W X Y Z
或是輸入前幾個字:  
顯示 21 到 40 筆資料,總共 182 筆 < 上一頁   下一步 >
日期標題作者全文
五月-2011Characteristic Tailored Finite Point Method for Convection-Dominated Convection-Diffusion-Reaction ProblemsShih, Yintzer; Kellogg, R.Bruce; Chang, Yoyo; National Chung Hsing University,Department of Applied Mathematics; 國立中興大學應用數學系; Miao-zhen Luo-
1990(The Chinese Journal of Mechanics,06(2):093-098 )Grain Flow in A Converging Conical ChannelLin-Tsang Lee; 國立中興大學應用數學系-
2009(Communications in Statistics- Theory and Methods,38(9):1508-1525)An Availability System with General Repair Distribution:Statistical InferenceJ. C. Ke; Z. L. Su; K. H. Wang; 國立中興大學應用數學系-
三月-2004Comparative Analysis for the N Policy M/G/1 Queueing System with a Removable and Unreliable ServerK. H. Wang; L. P. Wang; J. C. Ke; 國立中興大學應用數學系-
1990(Computers and Industrial Engineering,18(4):511-520)Comparative Analysis for the G/G/R Machine Repair ProblemK. H. Wang; B. D. Sivazlian; 國立中興大學應用數學系
1994(Computers and Industrial Engineering,26(4):765-774)Comparative Analysis for the M/Ek/1 Machine Repair Problem with SparesK. H. Wang; 國立中興大學應用數學系
1995(Computers and Industrial Engineering,28(1):163-178)Reliability of a Controllable M/M/2 System with Warm Standbys Operating Under the Triadic (0,Q,N,M) PolicyK. H. Wang; C. L. Chang; 國立中興大學應用數學系
1997(Computers and Industrial Engineering,32(3):587-594)Profit Analysis of the M/Ek/1 Machine Re-pair Problem with a Non-Reliable Service StationK. H. Wang; M. Y. Kuo; 國立中興大學應用數學系
1997(Computers and Industrial Engineering,33(1-2):129-132)Life cycle cost analysis for availability system with parallel componentsK. H. Wang; B. D. Sivazlian; 國立中興大學應用數學系-
2007(Computers and Industrial Engineering,52(2):192-202)Maximum Entropy Analysis of the N Policy M[x]/M/1 Queueing System with Multiple Vacations and Server BreakdownsK. H. Wang; M. C. Chan; J. C. Ke; 國立中興大學應用數學系
2007(Computers and Operations Research,34(3):835-847)Profit Analysis of the M/M/R Machine Repair Problem with Balking,Reneging,and Standby Switching FailuresK. H. Wang; J. B. Ke; J. C. Ke; 國立中興大學應用數學系-
1995(Computers and Structures, 54(5):997-1001)Free Vibration of Cylindrical Shells Filled with LiquidLin-Tsang Lee; J. C. Lu; 國立中興大學應用數學系
1995(Computers and Structures, 57(1):167-175)Pressure Exerted by a Granular Material along a Curved ChannelLin-Tsang Lee; D. C. Lee; 國立中興大學應用數學系
1996(Computers and Structures, 58(5):957-971)Equivalent Systems for Variable Thickness Circular PlatesLin-Tsang Lee; W. K. Lo; 國立中興大學應用數學系
1997(Computers and Structures, 65(2):149-156)Free Vibration of Rectangular Plates on Elastic Point Supports with the Application of a New Type of Admissible FunctionLin-Tsang Lee; D. C. Lee; 國立中興大學應用數學系
1997Consistency of Nonparametric Multiple Change Points李宗寶; 行政院國家科學委員會; 國立中興大學應用數學系-
八月-2007Cost Analysis of an M/M/R queue with Multiple Working VacationsC. H. Wu; K. H. Wang; J. C. Ke; J. B. Ke; 國立中興大學應用數學系-
三月-2004Cost Benefit Analysis of Series Systems with Cold Standby Components and a Repairable Service StationK. H. Wang; C. H. Hsieh; C. H. Liou; 國立中興大學應用數學系-
十二月-2011Differential Measurement Errors in Zero-Truncated Regression Models for Count DataHuang, Yih-Huei; Hwang, Wen-Han; Chen, Fei-Yin; National Chung Hsing University,Department of Applied Mathematics; 國立中興大學應用數學系; Miao-zhen Luo-
十月-1996Economic Analysis of the Machine Repair Problem with Cold Standbys and Multiple Failure ModesK. H. Wang; H. C. Lee; 國立中興大學應用數學系-