Browsing by Author Juite Wang

Jump to: 0-9 A B C D E F G H I J K L M N O P Q R S T U V W X Y Z
or enter first few letters:  
Showing results 1 to 20 of 76  next >
DateTitleAuthor(s)File
Jun-1999(1999 Conference on Production Scheduling:Theory and its Applications:A71-A76)Producing a Project Schedule with the Minimum Schedule Risk for Product Development:A Fuzzy Set Approach王瑞德; Juite Wang; J. Wang; 國立中興大學科技管理研究所-
Oct-1997(4th International Conference on Computer Integrated Manufacturing and Automation Technology:623-632)A Fuzzy Multi-Criteria Decision Framework for QFD Planning王瑞德; Juite Wang; J. Wang; 國立中興大學科技管理研究所-
Feb-2015A data mining approach for training evaluation in simulation-based trainingJuite Wang; Yung-I Lin; Shi-You Hou
Jan-2015A real options framework for R&D planning in technology-based firmsJuite Wang; C.-Y. Wang; Cheng-Yo Wu-
1991(Applications of Artificial Intelligence in Engineering VI:163-178)Decomposition of Design Activities王瑞德; Juite Wang; A. Kusiak; J Wang; 國立中興大學科技管理研究所-
1993(ASME Transactions: Journal of Mechanical Design, 115(4):687-695)Decomposition of the Design Process王瑞德; Juite Wang; A. Kusiak; J. Wang; 國立中興大學科技管理研究所
1996(ASME Transactions: Journal of Mechanical Design, 118(4):470-477)Negotiation in Constraint-Based Design王瑞德; Juite Wang; A. Kusiak; J. Wang; 國立中興大學科技管理研究所
Nov-1993(ASME Winter Annual Meeting:021-032)Qualitative Analysis of the Design Process王瑞德; Juite Wang; A. Kusiak; J Wang; 國立中興大學科技管理研究所-
1991(Computer Applications in Production and Engineering:Integration Aspects:297-304)Concurrent Engineering:Simplification of the Design Process王瑞德; Juite Wang; A. Kusiak; J Wang; 國立中興大學科技管理研究所-
1994(Computers and Industrial Engineering, 26(3):521-536)Reengineering of Design and Manufacturing Processes王瑞德; Juite Wang; A. Kusiak; J. Wang; N. Larson; 國立中興大學科技管理研究所
Aug-1994Concurrent Engineering:Models and Solution Approaches王瑞德; Juite Wang; A. Kusiak; J Wang; 國立中興大學科技管理研究所-
Jan-1994Decomposition of the Design Process王瑞德; Juite Wang; K. K. Choi; E. J. Haug; K. Kortanek; A. Kusiak; T. Lowe; J. Wang; 國立中興大學科技管理研究所
Jun-2006Designing new product supply chains using a possibilistic approach王瑞德; Juite Wang; J. Wang; 國立中興大學科技管理研究所-
Dec-2002Developing Robust Inventory Strategy for New Product Supply Chain王瑞德; Juite Wang; J. Wang; 國立中興大學科技管理研究所-
2015Discovering Technological Opportunities for Microfluidic biochip Using Keyword-Based Patent Analysis王瑞德; Juite Wang; 王宇丞; Yu-Cheng Wang; 科技管理研究所
Aug-1999(Eighth International Fuzzy Systems Association World Congress:949-953)A Fuzzy Beam Search Approach For Scheduling of Design Activities with Imprecise Temporal Information王瑞德; Juite Wang; J. Wang; 國立中興大學科技管理研究所-
2004(European Journal of Operational Research, 152(1):180-194)A fuzzy robust scheduling approach for product development projects王瑞德; Juite Wang; J. Wang; 國立中興大學科技管理研究所
2007(European Journal of Operational Research, 177(2):1044-1061)A possibilistic decision model for new product supply chain designJuite Wang; 王瑞德; J. Wang; Y.-F. Shu; 國立中興大學科技管理研究所
2004(Expert Systems with Applications, 27(4):593-607)A fuzzy constraint satisfaction approach for electronic shopping assistance王瑞德; Juite Wang; J. Wang; C.-H. Dai; 國立中興大學科技管理研究所
May-1992(First Industrial Engineering Research Conference:213-218)A Neural Network Approach to Negotiation Process in Engineering Design王瑞德; Juite Wang; A. Kusiak; J Wang; 國立中興大學科技管理研究所-