Please use this identifier to cite or link to this item:
http://hdl.handle.net/11455/34686
標題: | 水土保持計畫施工檢查之研究 Construction Inspection of Soil and Water Conservation Plan |
作者: | 陳立晃 Chen, Lee-Huang |
關鍵字: | Soil and water conservation plan;水土保持計畫;Construction inspection;施工檢查 | 出版社: | 水土保持學系所 | 引用: | 吳嘉俊(2005),「水土保持計畫與技術規範之實務分析」,行政院農業委員會編號SWCB-94-117 林昭南、黃宏斌(2004) ,「水土保持計畫審核與監督實務」,中華水土保持學報,第35卷,第4期,P.331-338 段錦浩、翁曉玲(2004),「水土保持處理與維護之限期改正相關研究」,行政院農業委員會編號:SWCB-93-164 段錦浩、王鈞彥、陳重光(2004),「水土保持有關『致生水土流失』之鑑定案例研析」,中華水土保持學報,,第35卷,第4期,P.339-352 陳亦集(2005),「水土保持之限期改正研究」,國立中興大學碩士論文。 陳重光(2006),水土保持治理與管理介面之初步探討,坡地防災學報,第5卷,第1期,P.27-68 陳重光(2008) ,「水土保持法規管理實務之研究」,國立中興大學博士論文。 許宏達、陳重光(2004),水土保持法中「連續處罰」及「限期改正」制度之法律研究,中華水土保持學報,,第35卷,第4期,P.323-330。 許桂端(2006),水土保持計畫審查之研究,國立中興大學碩士論文。 翁曉玲(2004),「論坡地管理之共同違法處罰與數行政罰競合之處理」,台灣科技法律與政策論叢,第3卷,第4期,P.169-218 黃宏斌(2006),研編水土保持計畫施工監督檢查標準作業流程,行政院農業委員會編號SWCB-95-057。 溫思潔(2006),水土保持法之致生水土流失鑑定及限期正研究,國立中興大學碩士論文。 楊宏敏(2006),水土保持計畫施工檢查表格之研究,國立中興大學碩士論文。 | 摘要: | 水土保持計畫係為實施水土保持之處理與維護所訂之計畫,而計畫審核通過後的開工、施工、完工監督管理,都有其一套標準的作業流程與規定事項,這是為水土保持管理的一道重要的防線,所有的行為一切依照水土保持相關法規、技術規範及水土保持計劃審核監督辦法,處理相關業務之機關團體和專業技師就必須負起所應盡之責任與義務。 本研究主要藉現場實際例子,將其所發生之問題紀錄,予以統整、分類、分析提出解決之道以及建議,以便提供專業技師與相關從業人員參考,避免再犯相同的錯誤,藉此提升水土保持計畫與工程之水平、品質,以及效率,以使整個水土保持計畫監督檢查管理部份更臻成熟完善。 由問卷結果得知七項常見問題與本人隨同指導教授至現場累積的經驗與經歷大多雷同,當中最常遇到的就是【滯洪沉砂池】的問題,這是非常關鍵的重點。 Soil and water conservation plans are projects framed to effectively conserve the soil and water of slopland. After the plans being fully investigated and reviewed by investigators, standard procedures and regulations of both construction management and supervision must be put into practice in every stage of constructions. Soil and Water Conservation Plans are the important defence line for administering soil and water conservation. Any conduct concerning such construction plans should be performed under the imperatives of Soil and Water Conservation Act, Soil and Water Conservation Plan Review, Approval and Supervision Regulations, Technical Regulations for Soil and Water Conservation and all other related laws and regulations. And all the authorities and professional engineers involved should take legal responsibilities for every decision made. In this thesis, I generalized and analyzed, from questionnaires and some cases author experienced, some difficulties and problems one may be confronted with during the reviews and enforcements of soil and water conservation plans to serve as references for professional engineers and all other people involved, so that same mistakes will not be made again. As in my research, the seven most-often confronted problems I classified from questionnaires are mostly the same as what I witnessed when accompanying my adviser to inspect construction sites. Among them, problems concerning the sedimentation and flood detention pond are the first on the list, while those concerning modification of soil and water conservation plans are ranked the second. These two most-often-confronted problems are what all personnel should strive to solve in order to assure high construction quality. |
URI: | http://hdl.handle.net/11455/34686 | 其他識別: | U0005-2207200801145800 |
Appears in Collections: | 水土保持學系 |
Show full item record
TAIR Related Article
Google ScholarTM
Check
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.