Please use this identifier to cite or link to this item: http://hdl.handle.net/11455/77119
標題: 梳子壩治理土石流成效之案例研究
Case Study on the Effects of Debris Flow Control by Slit Dam
作者: 連惠邦
Hui-Pang Lien
關鍵字: debris flow;土石流;sit dam;梳子壩
Project: 中華水土保持學報, Volume 32, Issue 4, Page(s) 271-278.
Journal of Chinese Soil and Water Conservation, Volume 32, Issue 4, Page(s) 271-278.
URI: http://hdl.handle.net/11455/77119
ISSN: 0255-6073
Appears in Collections:第32卷 第04期
水土保持學系

Show full item record
 

Google ScholarTM

Check


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.