Please use this identifier to cite or link to this item: http://hdl.handle.net/11455/79307
標題: 阿里山森林鐵路路基之破壞原因與邊坡穩定治理工法之初步探討:以森林鐵路42k+940~43k+040 為例
A preliminary study on the causes of failure and the remediation efforts of slope stabilizing for the Alishan Forest railway between sections 42k+940 and 43k+040
作者: 羅大為
吳志展
關鍵字: 阿里山森林鐵路;Alishan Forest Railway;邊坡穩定;Slope stabilization
Project: 水土保持學報, Volume 43, Issue 2, Page(s) 219-228.
URI: http://hdl.handle.net/11455/79307
Appears in Collections:水土保持學系
第43卷 第02期

Files in This Item:
File Description SizeFormat Existing users please Login
82990-7.pdf739.19 kBAdobe PDFThis file is only available in the university internal network    Request a copy
Show full item record
 

Google ScholarTM

Check


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.