dc.description.abstractInspection of facilities quality in rural rejuvenation project has been conducted by Council of Agriculture, Soil and Water Conservation Bureau since 2011. By the end of 2013, a total of 288 engineering samples have been tested. Among those, 26 engineering were rated in A+ grade, 191 in A grade, 45 in B grade, and 26 in C grade which meant unqualified. Most of unqualified engineering were the degree of compaction and thickness of asphalt concrete did not meet the requirement standard. According the results of testing, most of reduction rates fell in the range of 0.89≧X≧0.6. Furthermore, the relationship between engineering reduction rate and quality was analyzed. The result showed that, the ratio of unqualified engineering is higher when the reduction rate is less than 0.6. This means that, the price competition will lead to the low quality of the construction.en_US
dc.description.abstract行政院農業委員會水土保持局民國100年度開始辦理農村再生設施工程品質抽驗,截至民國102年底,共抽驗288件工程,其中評等為A+等級者,計26件工程;評等為A級者,計191件工程;評等為B級者,計45件工程;評等為C級者(不合格者),計26件工程,不合格工程中,以瀝青混凝土壓實度及厚度不合格為最多。統計歷年完成施工品質抽驗工程中,金額折減率大多落在0.89≧X≧0.6,計209件,達73%;其中以0.79≧X≧0.7為最多,計85件,達總抽驗件數的30%。進而分析工程金額折減率與品質評等之相關性,可得知金額折減率<0.6之不合格工程,其比例遠高於其他評等之比例,表示削價競爭的結果下,廠商對施工品質可能無法堅持。zh_TW
dc.language.isozh_TWzh_TW
dc.relation水土保持學報, Volume 47, Issue 2, Page(s) 1383-1394.zh_TW
dc.subjectRural regenerationen_US
dc.subjectThe amount of reduction rate engineeringen_US
dc.subjectConstruction qualityen_US
dc.subject農村再生zh_TW
dc.subject工程金額折減率zh_TW
dc.subject施工品質zh_TW
dc.titleInvestigation of Reduction Rate in Rural Rejuvenation Projects and Construction Quality Relationshipen_US
dc.title農村再生工程金額折減率與施工品質關係之探討zh_TW
dc.typeJournal Articlezh_TW
item.cerifentitytypePublications-
item.grantfulltextopen-
item.languageiso639-1zh_TW-
item.fulltextwith fulltext-
item.openairecristypehttp://purl.org/coar/resource_type/c_18cf-
item.openairetypeJournal Article-
Appears in Collections:第47卷 第02期
Files in This Item:
File Description SizeFormat
86998-6.pdf982.93 kBAdobe PDFView/Open
Show simple item record
 

Google ScholarTM

Check


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.